Constructed between 1913-1919 near the twin cities of Sault Saint Marie and Ontario by three hydropower plants and a 16 gate control structure. Its purpose is to control Lake Superior outflow, though this control was not completely acquired until 1921 when the south dike was built. Consists of a series of piers, towers, and gates to regulate outflow.
Project glossaries that use this term: